Box 8
Contains 27 Results:
Bridges' first flight in the YA-10, test cards, June 27, 1972
First YA-10 and YA-9 flight test cards flown by the company test pilots, undated
A-10 brake tests of new system installed after accident, undated
Test cards for the first Air Force flights in the YA-9 and YA-10 flown by Major Buzz Lynch and Major Larry Fortner, A-X Test Force Director and Operations Officer respectively, undated
Typical test cards and flight activity report for one of Bridges' test flights, September 19, 1974
Flight time for each pilot participating in the A-X Flyoff, undated
Schedule of A-37 bombing sorties preliminary to the A-X Flyoff-competition determined which four of the seven would participate in the A-X Flyoff Weapons Delivery Evaluations, undated
Note: Bridges was one of the four selected.
Total time flown by the various aircraft during the A-X Flyoff, undated
A10 JTF/SPO Names/Phone numbers, 1974 - 1975
Includes various phone and attendance lists for the people participating in the development and flight test of the A-9 and A-10.
A-9A/A-10A Training, various documentation of Bridges' training to fly these aircraft during the A-X Flyoff, October 1972
Captain Bridges, Roy D., Jr., Phase I Comp: 27 Mar 73, Bridges' Standardization/Evaluation folder for the A-10, March 27, 1973
Stall/Spin Warning System Development and Test, 1975
Various documentation describing the system and test plans for this system and test plans for this system conceived by Bridges to correct a deficiency.
Stall/Spin Flight Manual Write-up, various documentation on the first draft section for the Flight Manual on this subject, 1975
Spin Avoidance Briefing, Intentionally Spinning the A-10 System, Program Director, B/G Brill (to obtain approval to proceed to the next phase of the program, intentionally spinning the A-10 to determine departure and recovery characteristics and procedures), March 14, 1975
Stall/Spin Em Systems, 1974
Descriptions of emergency systems and flight-test modifications to assist with potential problems that could arise during the stall/spin test series.
Stall/Spin Systems, 1975
Correspondence and handwritten briefing slide notes on the spin training for the two project pilots; Bridges and Sam Nelson, Fairchild Republic Test Pilot, to prepare them to conduct spin tests in the YA-10.
Stall/Spin Systems TIS , 1975
Test Information Sheet and approved Safety Review package for the Phase D of the Stall/Spin Program for the YA-10, also a briefing on Pave Penny Pod and a proposed high AOA indicator system is included.
Stall/Spin Committee Correspondence/Schedules, 1975
Included are Bridges' hand drawn diagram of the profile and procedures for entering the spin corridor for a test point, a handwritten description of the first spin encountered, and various other correspondence relative to the test program.
Stall/Spin Procedures/Safety, 1975
Various documents relative to safety procedures, e.g., briefing cards for the chase pilot, data reduction flow and timelines, Memo of Agreement for the program, Test Monitor Responsibilities.
Spin Avoidance General Info, 1975
Includes various articles and specifications for reference are enclosed.