Skip to main content Skip to search Skip to search results

Box 62

 Container

Contains 3 Collections and/or Records:

LM Main propulsion systems, February 20, 1967

 Item — Box: 62, Folder: 4, Item: 1
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 10, Item 10
Scope and Contents From the Sub-Group: The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.
Dates: February 20, 1967

STL LEM Descent Engine Support Manual, Section II, GAEC Para. 10.1, October 29, 1965

 Item — Box: 62, Folder: 4, Item: 2
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 10, Item 11
Scope and Contents From the Sub-Group: The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.
Dates: October 29, 1965

Gimbal drive Actuator System, circa 1966

 Item — Box: 62, Folder: 4, Item: 3
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 10, Item 12
Scope and Contents From the Sub-Group: The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.
Dates: circa 1966