Skip to main content Skip to search Skip to search results

Box 46

 Container

Contains 3 Collections and/or Records:

A Review of In-Flight Simulation Pertinent to Piloted Space Vehicles, July 1962

 Item — Box: 46, Folder: 3, Item: 1
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 3, File 5, Item 17
Scope and Contents From the Sub-Group: The training files contain a wide variety of materials used specifically in the astronaut training programs which led to the success of the Apollo missions. Neil Armstrong played a large role in designing both simulation training exercises and in the development of the Lunar Landing Research Vehicle (LLRV). The LLRV was a specialized training vehicle designed to train pilots how to fly and land the lunar module, and as such, presented a unique engineering problem to its development team; i.e....
Dates: July 1962

Uprated LLRV Pre-Design Configuration Studies for Research & Training, July 1964

 Item — Box: 46, Folder: 3, Item: 2
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 3, File 5, Item 18
Scope and Contents From the Sub-Group: The training files contain a wide variety of materials used specifically in the astronaut training programs which led to the success of the Apollo missions. Neil Armstrong played a large role in designing both simulation training exercises and in the development of the Lunar Landing Research Vehicle (LLRV). The LLRV was a specialized training vehicle designed to train pilots how to fly and land the lunar module, and as such, presented a unique engineering problem to its development team; i.e....
Dates: July 1964

Visit to Grumman Aircraft Corporation (GAEC) to discuss LM control system characteristics, April 16, 1968

 Item — Box: 46, Folder: 3, Item: 3
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 3, File 5, Item 19
Scope and Contents From the Sub-Group: The training files contain a wide variety of materials used specifically in the astronaut training programs which led to the success of the Apollo missions. Neil Armstrong played a large role in designing both simulation training exercises and in the development of the Lunar Landing Research Vehicle (LLRV). The LLRV was a specialized training vehicle designed to train pilots how to fly and land the lunar module, and as such, presented a unique engineering problem to its development team; i.e....
Dates: April 16, 1968