Box 13
Container
Contains 2 Results:
Request for Engineering Change Proposal: Individual Pressure Reference System for Fuel Cell Section #1 and #2, December 28, 1965
Item — Box: 13, Folder: 3, Item: 6
Identifier: MSA 5, Series 1, Sub-Series 4, Sub-Group 2, File 5, Item 8
Scope and Contents
From the Sub-Group:
Working files related to the Gemini program consist of documents detailing the spacecraft and equipment used by Gemini astronauts in most of the Gemini missions under the heading "Systems." Following these technical documents are coursework and memos related to the training undertaken by Neil Armstrong for his part in Gemini missions under the heading "Training." Memos, working documents, internal notes, and reports which detail the planning of specific Gemini missions, particularly Gemini...
Dates:
December 28, 1965
Contract NAS 9-170, Review of Contractor Actions relative to Spacecraft Acceptance Review, Phase I, Spacecraft 8, January 31, 1966
Item — Box: 13, Folder: 4, Item: 6
Identifier: MSA 5, Series 1, Sub-Series 4, Sub-Group 2, File 5, Item 21
Scope and Contents
From the Sub-Group:
Working files related to the Gemini program consist of documents detailing the spacecraft and equipment used by Gemini astronauts in most of the Gemini missions under the heading "Systems." Following these technical documents are coursework and memos related to the training undertaken by Neil Armstrong for his part in Gemini missions under the heading "Training." Memos, working documents, internal notes, and reports which detail the planning of specific Gemini missions, particularly Gemini...
Dates:
January 31, 1966