Skip to main content

Schedule for 17 KC N128 Service Module; Integrated Test Stand N24008; Life Support System Test Mockup N22108; Crew Trainer/Mockup N 22708; Propulsion System Test Stand N23408; Propulsion System Design Reference Mockup N23008; Hydrolab Mockup N 23108; Full-Scale, Three Dimensional Mockup N24108; Cycle Test Mockup N24208, 24211; Ground Final Adjustment Facility (HKO) for Motion Control System and Onboard Complex Control System; Docking Assembly Final Work; TCS (CTP) Radiator Final Work, 1997 - 1998

 File — Box: 1, Folder: 15
Identifier: MSA 272, File 16

Scope and Contents

From the Collection:

The Mark S. Geyer papers document Geyer's time as Manager, Russian Elements Team for the International Space Station. The material provides a glimpse into the technical interface with the Russian Space Agency and its contractors to integrate Russian elements and systems into the International Space Station. The papers include a rich assortment of development schedules.

Types of material include: correspondence, minutes, reports and schedules. Some of the materials are photocopies of originals.

Dates

  • Creation: 1997 - 1998

Creator

Language of Materials

Some text in Russian.

Conditions Governing Access

Collection is open for research.

Extent

From the Collection: 0.424 Cubic Feet (One letter-size full-width manuscript box, and Digital files)

Repository Details

Part of the Purdue University Archives and Special Collections Repository

Contact:
504 Mitch Daniels Boulevard
West Lafayette Indiana 47907 United States
765-494-2839