Conveyor Tunnel (West Lafayette, Ind.)
Organization
Dates
- Existence: 1997-
Historical Information
The Conveyor Tunnel is located south of the Walter W. Wade Utility Plant and connects the Coal Handling Control/Fire Pump Building to the Coal Hopper. It was built alongside the rest of the coal handling facilities between 1995 and 1997 for a total of $1,608,745.